Solstice Success

on the longest day, i finally got over the halfway point with the project fondly named “Two”.  i am now officially “putting back together” more than i am “taking apart”.  There is still plenty of floor to remove in the back still, but here is the first and hardest sheet of new plywood floor installed.

20170621_194032

but first, the torn swing out step frame had to be fixed.

20170614_124818

one of those things easier to work with on a bench, so cut out the whole thing, along with the frame pieces it was attached (sorta) to.

20170619_131536

i could see making this a lift-gate door now, or a drop ramp…

20170619_131518

but no, lets go with sturdy box tube door frame that i can add a step to later.

20170621_194100

sorry, no closeups of the flux-core 120vac welds, you can just imagine yucky gross blobs and splatter. will hit it with gas mig when i do the step.  after its rolling again.

tomorrow, weld a brace at the 2/3 seam, sheet #2 then goes in, and #4 can come out.  this project is Zen forcing my “lots of littles” discipline game.

 

 

Leave a Reply